10 realistic exam questions, graded as you go, with the exact rule or statute citation for every answer. Start free, no sign-up.
Timed mock exam
36 questions in 43 minutes, drawn from every topic. No answers shown until the end, then a full score breakdown, your weakest topics and a review of what you missed.
Prices are in US dollars, plus tax where it applies. Stripe, our payment processor, calculates tax at checkout.
All sales are final. If something is really wrong, such as a duplicate charge or a purchase that does not unlock what you bought, write to support@careerexampro.com and we will put it right.
One-time payment. Nothing renews.
You have an exam ticket for this practice test. Start the timed mock exam to use it.
Exact question counts, passing scores, and allowed reference materials vary by testing window and state/agency. Always confirm current rules with the official testing provider.
Sample questions
A quantitative risk assessment evaluates a regional data center valued at $800,000 (Asset Value). Historical climate data indicates a severe flood is expected to occur once every 4 years (ARO = 0.25) and would damage 35% of the facility's value (Exposure Factor = 0.35). What is the Annualized Loss Expectancy (ALE) for this flood risk?
$280,000, calculated by multiplying the $800,000 Asset Value directly by the 35% Exposure Factor for a single flood event.
$70,000, derived from a Single Loss Expectancy (SLE) of $280,000 multiplied by an Annualized Rate of Occurrence (ARO) of 0.25.
$200,000, derived by dividing the $800,000 Asset Value evenly across the 4-year recurrence interval without factoring in partial damage.
$1,120,000, derived by multiplying the $280,000 Single Loss Expectancy by the 4-year recurrence period to project multi-year exposure.
Show the answer
B. $70,000, derived from a Single Loss Expectancy (SLE) of $280,000 multiplied by an Annualized Rate of Occurrence (ARO) of 0.25.
Under quantitative risk analysis, Single Loss Expectancy is SLE = AV × EF = $800,000 × 0.35 = $280,000. Annualized Loss Expectancy is ALE = SLE × ARO = $280,000 × 0.25 = $70,000. Dividing AV by 4 omits the Exposure Factor, while multiplying SLE by 4 inverts the ARO fraction (1/4 = 0.25).
Which attack technique best explains this log pattern, and why did it evade per-account lockout controls?
A vertical brute-force attack targeting a single privileged account with an automated dictionary wordlist until the threshold resets.
A pass-the-hash replay attack injecting stolen NTLM digests directly into Kerberos ticket-granting requests to bypass password validation.
A password-spraying attack testing one common password across many accounts to stay below each account's lockout threshold.
A session-hijacking attack replaying a stolen SAML bearer assertion across multiple federated accounts before the token expiration window.
Show the answer
C. A password-spraying attack testing one common password across many accounts to stay below each account's lockout threshold.
Password spraying (MITRE ATT&CK T1110.003) tests a small number of commonly used passwords horizontally across many usernames so no single account exceeds its failed-login lockout threshold. The single success on an account lacking MFA (j.patel) requires immediate containment, password reset, and MFA enforcement.
A bank's Business Impact Analysis (BIA) establishes a Maximum Tolerable Downtime (MTD) of 8 hours, a Work Recovery Time (WRT) of 2 hours for transaction reconciliation and backlog catch-up, and a Recovery Point Objective (RPO) of 15 minutes for its wire-clearing platform. What is the maximum permissible Recovery Time Objective (RTO), and what does the 15-minute RPO govern?
Maximum RTO is 6 hours (MTD - WRT), and the 15-minute RPO sets the maximum tolerable data loss governing backup or replication frequency.
Maximum RTO is 10 hours (MTD + WRT), and the 15-minute RPO specifies the time required for IT staff to declare a disaster and notify executives.
Maximum RTO is 7 hours 45 minutes (MTD - RPO), and the 2-hour WRT sets the minimum retention period for immutable off-site backup snapshots.
Maximum RTO is 8 hours (equal to MTD), and the 15-minute RPO governs the maximum time allowed to verify restored ledger balances after cutover.
Show the answer
A. Maximum RTO is 6 hours (MTD - WRT), and the 15-minute RPO sets the maximum tolerable data loss governing backup or replication frequency.
In business continuity planning (NIST SP 800-34 / ISC2 CISSP), total recovery must fit within MTD: RTO + WRT <= MTD. With MTD = 8 hours and WRT = 2 hours, technical infrastructure restoration (RTO) cannot exceed 6 hours. RPO independently defines the maximum acceptable age of recovered data (15 minutes of data loss), driving replication and backup intervals.